Preparing for spring 2018

The weather sure likes to keep things interesting around here! Just two weeks ago we were experiencing an early spring, but this week we ended up shoveling several inches of snow. Nevertheless, spring should actually arrive for real before too long, and our team is getting prepared!

First, though, they have to do some clean-up. “A lot of tree branches came down during those last two storms,” says Matt Giberson. “So we’ve been clearing all that out.” The weather also, unfortunately, put a hold on sanding, but the team is very nearly finished! “We have two, two and a half days left,” Matt says. “We’re taking advantage of the time change to work a little later next week to finish it up. We would have been done today, if the weather had cooperated, but unfortunately it did not!”

Once that’s finished, though, the team will take advantage of the location. “Once we’re done, we’re going to patch up some dams that need work over at Sim Place, since we’ll have all the equipment we’ll need for that over there already. In the meantime, we’ll bring the sanding barges back and move on to installing gates up at the Cedar Swamp renovation.”

We’ll also be taking off the water before too long! “We’ll have a small crew doing early draw this year,” Matt says. “The plan is to do two to three systems a day to get ahead of that, concentrating on the young beds that we’re not going to frost protect this year. The priority will be getting Cedar Swamp ready to go so we can get the planting started. The earlier we plant, the earlier we get a head start on the growing season.”

As far as the established beds are concerned, the last two days of March the team will be installing the sprinklers before starting to take the rest of the water off the first week of April. “I haven’t done the numbers yet, but we’re shooting for four to five systems a day,” says Matt. “We’re not doing anything too unusual, but we have a lot of work ahead of us!”

The team has a busy spring planned, but there’s no doubt they’ll do whatever it takes to get it all done. And don’t forget, if you want to join them, we’re still looking for an ICM foreman!